Home M12441 Digest
AI-generated summary · Application · 11/05/2025

NSEB accepts Nova Scotia Power's 2025 Emergency Services Restoration Plan Drill Report and revised ESRP Rev 5.2 as filed

M12441 · Nova Scotia Power - Emergency Services Restoration Plan - 2025 Drill Report
AI summary
  • Nova Scotia Power filed its 2025 ESRP Drill Report on August 28, 2025, meeting the annual August 31st filing deadline under Matter M12441.
  • The Nova Scotia Energy Board noted a significant decline in Emergency Operations Centre activations — zero between September 2024 and August 2025, compared to six activations reported in the prior year's drill report (M11867).
  • The June 5, 2025 drill scenario was modelled on a Level 3 or 4 storm causing transmission losses and road washouts, set in the context of NS Power's recent cyber incident; the drill produced four action items, three of which remain in progress.
  • NS Power recommended two changes to the ESRP — both limited to updating role title names — and filed Revision 5.2, which the Board accepted as filed.
  • NS Power is directed to report on progress completing the one outstanding 2023 Action Item and three in-progress 2025 Action Items in its next annual ESRP Drill Report.

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • 99901 Board Letter re: accepted as filed other_documents