AI-generated summary
· Application · 11/05/2025
NSEB accepts Nova Scotia Power's 2025 Emergency Services Restoration Plan Drill Report and revised ESRP Rev 5.2 as filed
AI summary
- Nova Scotia Power filed its 2025 ESRP Drill Report on August 28, 2025, meeting the annual August 31st filing deadline under Matter M12441.
- The Nova Scotia Energy Board noted a significant decline in Emergency Operations Centre activations — zero between September 2024 and August 2025, compared to six activations reported in the prior year's drill report (M11867).
- The June 5, 2025 drill scenario was modelled on a Level 3 or 4 storm causing transmission losses and road washouts, set in the context of NS Power's recent cyber incident; the drill produced four action items, three of which remain in progress.
- NS Power recommended two changes to the ESRP — both limited to updating role title names — and filed Revision 5.2, which the Board accepted as filed.
- NS Power is directed to report on progress completing the one outstanding 2023 Action Item and three in-progress 2025 Action Items in its next annual ESRP Drill Report.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- 99901 Board Letter re: accepted as filed