· Application · 06/22/2026
NSEB requests Renewall Energy Inc. comment on status of RtR tariff stakeholder engagement arising from 2026 AAR directive
AI summary
- The Board issued a June 22, 2026 letter to Renewall Energy Inc (REI) counsel at Stewart McKelvey, requesting comments by July 6, 2026 on the status of Tariff Design discussions related to Rate Design Renewable to Retail (RtR) tariffs directed in the 2026 AAR decision.
- Nova Scotia Power Inc advised it has provided REI with requested monthly 2024 and 2025 marginal cost data and remains available for further discussion, but has received no feedback from REI to date.
- NS Power proposed deferring a further update on this matter until the 2027 AARs application is filed in November 2026.
- The Board identified three related proceedings affecting RtR tariffs: M11422 (Large Industrial Interruptible Rider Pilot), M12339 (development of RtR tariffs, standards of conduct, and net billing procedures), and M12588 (NS Power's cost recovery application).
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- 102457 Board letter re: Comments from REI about the status of issues in letter