Home M12663 Digest
AI-generated summary · Application · 06/25/2026

IESO Nova Scotia issued an RFP for a consulting engagement to develop a Phase 2 transition plan and IT/OT/cybersecurity roadmap supporting the transfer of power system dispatching and control from Nova Scotia Power by April 2027.

M12663 · Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026/2027 Revenue Requirement and Fees Application
AI summary
  • IESO Nova Scotia released a Request for Proposals (Exhibit N-17) for consulting services to plan the Phase 2 transfer of real-time dispatching and control functions from Nova Scotia Power to Ieso Nova Scotia, targeting April 2027, as mandated by the More Access To Energy Act.
  • The three-stage engagement scope covers current-state discovery, development of 4–5 strategic options for control center delivery (ranging from shared services with NSP to fully independent facilities), and production of a detailed IT, OT, and Cybersecurity roadmap with CapEx/OpEx estimates and NERC CIP compliance plans.
  • Proponents must demonstrate experience with control center builds, NERC CIP standards, IT/OT integration, and scaling solutions for smaller jurisdictions; the engagement must be completed with all deliverables signed off by March 31, 2026.
  • The RFP notes that NSP is still recovering from a cybersecurity event, which may constrain information availability, and requires proponents to attest to their ability to handle NERC CIP-sensitive information securely.
  • Pricing must be structured as a fixed fee for Stages I and II, with a range-based fee for Stage III (the transition and roadmap stage), tied to milestones and deliverables to maximize value for Nova Scotia ratepayers.

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • N-17 Transition Plan and IT, OT & Cybersecurity Roadmap - IESO exhibits
  • 20260625-1 Hearing Transcript — 06/25/2026 (Johnny Johnston, Chris Milligan, Mike McFeters, Angie Brown) transcripts