Multiple parties filed cross-examination Information Requests on intervenor evidence in EfficiencyOne's 2027–2031 DSM Plan proceeding, targeting cost-effectiveness methodology, demand response strategy, and strategic electrification.

M12780 · EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application
AI summary
  • The Small Business Advocate (Blackburn Law) issued seven IRs to Solar Nova Scotia (Exhibit E-24) probing the evidentiary basis for SNS recommendations on Energy Manager-style delivery for the Small Business Energy Solutions program, demand response integration of DSM-funded devices, and strategic electrification pathway development (SBA IRs 1–7 to SNS, due July 17, 2026).
  • Efficiencyone filed cross-IRs to the Consumer Advocate's consultant (Green Energy Economics Group) questioning the Standardized Filing Framework's role in setting DSM savings targets relative to the IRP, and challenging the cost-benefit rationale for pre-weatherization barrier funding under the low-income program (E1 CA IRs 1–2).
  • EfficiencyOne issued nine IRs to Nova Scotia Power's consultant (Brattle Group), sharply contesting the adequacy of Brattle's APEX peer-group critique, the comparability of Ontario's Peak Perks program to EcoShift given Nova Scotia's winter-peaking system, and Brattle's residential DR cost-per-kW benchmarks and scale assumptions (E1 NSPI IRs 1–9).
  • The Industrial Group (Stewart McKelvey) filed the largest IR sets: 13 IRs to the Consumer Advocate's expert (T. Love/GEEG) challenging mid-course adjustment trigger design, IRP-aligned savings feasibility at \$464M, DCRR impacts by rate class, incentive-level methodology, and Smart Synergy eligibility and cost allocation for Large Industrial Interruptible customers; 15 IRs to Brattle questioning DR funding reallocation, ELCC study currency, Otter Tail Power benchmark applicability, and Solar PV double-compensation; and 10 IRs to Synapse contesting the interpretation of the M12282 BCA Decision, the portfolio-level PAC cross-subsidy argument for strategic electrification, and mid-cycle adjustment threshold design (IG IRs to Love/GEEG 1–13, Brattle 1–15, Synapse 1–10).
  • EfficiencyOne confirmed it has no objection to virtual appearances by expert witnesses, and its counsel (McInnes Cooper) transmitted a companion set of four IRs to Synapse (Board Counsel's consultant) questioning the modified-PAC score for Round 2 SE resources (0.7), the NB Power statutory framework comparator for LMI electrification, DR capacity data in IRP Table 1, and the incremental cost of Synapse's recommended process evaluation.

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • 102616 SBA (SNS) IR 1 to 7 other_documents
  • 102617 SBA (Synapse) IR 1 to 3 other_documents
  • 102620 Letter E1 re: IRs other_documents
  • 102621 E1 (CA) IR 1 to 2 other_documents
  • 102622 E1 (NSPI) IR 1 to 9 other_documents
  • 102623 E1 (Synapse) IR 1 to 4 other_documents
  • 102626 Email E1 re: no objection to the requests of virtual appearances of expert witnesses. other_documents
  • 102631 CA (Brattle Group - NSPI) IR 1 to 10 other_documents
  • 102633 CA (Synapse) IR 1 to 9 other_documents
  • 102635 IG (Posterity Group - EE) IR 1 to 5 other_documents
  • 102637 IG (T. Love - CA) IR 1 to 13 other_documents
  • 102638 IG (SNS) IR 1 to 6 other_documents
  • 102639 IG (Brattle Group - NSPI) IR 1 to 15 other_documents
  • 102640 IG (Synapse) IR 1 to 10 other_documents