Home M12938 Digest
AI-generated summary · Application · 07/16/2026

Nova Scotia Power requested a one-week extension to respond to a DRO billing appeal filed by Anne-Louise Dauphinee, pending an in-person meter inspection at her duplex.

M12938 · NSPI DRO Appeal - Billing Issues - Anne-Louise Dauphinee
AI summary
  • Nova Scotia Power filed an extension request (Exhibit 102794) on July 16, 2026, seeking to move its reply deadline from July 17 to July 24, 2026 in Matter M12947, a DRO Appeal initiated by Anne-Louise Dauphinee.
  • The core dispute concerns whether the meter assigned to Ms. Dauphinee's account is physically connected to her unit or to the adjacent unit in her duplex — a factual question that NS Power acknowledges would resolve the appeal once verified.
  • NS Power has not yet been able to contact Ms. Dauphinee to schedule the required on-site meter inspection, preventing it from including definitive findings in its July 17 response.
  • NS Power committed that if the inspection is not completed by July 24, it will file its reply on that date and supplement the record with meter validation results as soon as they are available.

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • 102794 NSPI Extension Request re Response to Appeal other_documents