· Application · 07/21/2026
Town of Lunenburg Electric Utility filed updated rate schedules for three effective dates as part of its 2026 Flow Through Rate Application
AI summary
- Toleu submitted three revised Schedule A rate filings (exhibits L-2-(ii), L-2-(iii), and L-2-(iv)) covering effective dates of July 1, 2026, August 1, 2026, and January 1, 2027 respectively, each reflecting different Rates And Money levels across all customer classes.
- The Fuel Cost Adjustment flow-through mechanism embedded in Schedule A allows NSEB to amend rates without a public hearing when NSPI adjusts its Municipal Rate Class charges, DSM rates, or FAM riders, using prescribed formulae applied to forecasted purchase and sales volumes.
- Domestic Service energy rates vary across the three schedules: 18.492 ¢/kWh (July 1 and August 1, 2026) rising to 18.915 ¢/kWh (January 1, 2027), while Small General and General class rates also increase between the August 1, 2026 and January 1, 2027 schedules, reflecting a phased Rate Design approach.
- The July 1, 2026 schedule (L-2-(iii)) is notable for the removal of a rate cap, resulting in lower nominal rates across most classes compared to the subsequent August 1, 2026 filing (L-2-(iv)), which reintroduces certain minimum bill adjustments.
- Street and Yard Lighting monthly fixture charges are consistent between the July 1 and August 1, 2026 schedules ($23.06–$31.79/lamp/month) but increase in the January 1, 2027 schedule ($23.59–$32.51/lamp/month), consistent with the broader NSPI cost pass-through.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- L-2-(ii) Rate Schedule A 2026-07-01 with Flow Through IR-Updated
- L-2-(iii) Rate Schedule A 2026-08-01 with Flow Through and Rate Cap Removed IR-Updated
- L-2-(iv) Rate Schedule A 2027-01-01 IR-Updated