05589 Other documents 10/28/2010

Board Letter giving directions

Download original
05589.pdf · PDF · 116.4 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit containing a Board Letter giving directions. It covers the Nova Scotia Energy Board's approval of a 6-year testing cycle for 69 kV/138 kV systems, based on the review of NSPI's 2009 relay testing report, which noted a 2% failure rate, and the Board's decision to approve a shorter cycle than NSPI's requested 10-year cycle.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03232 — P-401.32 - Nova Scotia Power Inc. (NSPI) -  Relay Testing Report - 2009Review of Report

Filing event: APPLICATION on 10/28/2010 · View digest →

2 pages
100%