Letter to NERC/NPCC/NSPI asking NSPI to provide the Board with the proposed timeline by October 15, 2010. 9/17/2010
05274.pdf · PDF · 64.3 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit from a regulatory matter filed with the Nova Scotia Energy Board. It contains contact information for entities involved in a regulatory proceeding, including the North American Electric Reliability Corporation (NERC), Northeast Power Coordinating Council (NPCC), and Nova Scotia Power Inc. (NSPI), and outlines NSPI's commitment to filing a recommendation by year-end 2010 regarding reliability standards, with the Board requesting a proposed timeline by October 15, 2010.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M03324 — E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria