06392 Other documents 02/15/2011

Board Decision Letter

Download original
06392.pdf · PDF · 92.2 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit containing a Board Decision Letter from the Nova Scotia Utility and Review Board. It covers the approval of a reduced capital expenditure request by Nova Scotia Power Inc. for TRE5 boiler upgrades, based on scope reductions and the justification provided to prevent unplanned outages and align with a planned turbine outage.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03621 — CI# 38724 - P-128.10 - NSPI WO - TRE 5 Superheater, Reheater and Boiler Upgrades - $796,383

Filing event: DECISION on 02/15/2011 · View digest →

2 pages