U-1 - Papers Used to Analyze Mr. Chernick's Submission Other documents

06749 4/14/2011

Download original
06749.pdf · PDF · 307.2 KB · 11 pages
AI overviewWhat this document contains

This exhibit contains analysis of the COMFIT program costs under various resource mix scenarios and avoided cost assumptions. It includes tables summarizing the number of COMFIT projects, their associated costs, capacities, energy outputs, and financial figures for four resource mix scenarios: High Small Wind, High Large Wind, High Biomass, and High Tidal.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03632 — BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523

11 pages
100%