06757 4/14/2011
06757.pdf · PDF · 236.2 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit submitted as part of a Nova Scotia Energy Board regulatory matter. It contains a corrected version of a table detailing interconnection costs for various generation types, including small wind, biomass CHP, hydro, and tidal, under the 2012 tariff modeling, with specific focus on cost categories such as studies, equipment, line extensions, and totals.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M03632 — BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523