B-1 Exhibits 11/04/2010

Application

Download original
B-1.pdf · PDF · 1.0 MB · 6 pages
AI overviewWhat this document contains

This document is an exhibit from a regulatory matter filed with the Nova Scotia Utility and Review Board. It contains information regarding the Berwick Electric Commission's application for interim approval of two new electric supply rates designed to incentivize peak demand reduction and share cost savings with customers.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03672 — E-BER-R-10 - Berwick Electric Light Commission - Interim Application to offer rates to commercial  customers that will incent peak demand reductionIN THE MATTER OF THE APPLICATION by the TOWN OF BERWICK, on behalf of its ELECTRIC COMMISSION, for approval of an amendment to its Schedule of Rates for Electric Supply and Services.

6 pages
100%