P-11 Exhibits 01/13/2000

Direct Testimony of Fred Hussey (December 1999)

Download original
P-11.pdf · PDF · 1.5 MB · 9 pages
AI overviewWhat this document contains

This document is a direct testimony exhibit (P-11) filed as part of an application batch in a regulatory matter (P-871) before the Nova Scotia Utility and Review Board. It contains testimony by Fred Hussey, Vice-President of Engineering and Special Projects at Stora Enso Port Hawkesbury Limited, discussing the company's energy needs, operations, and support for Nova Scotia Power Inc.'s application for a Load Retention Rate, including the impact of energy costs on competitiveness and the benefits of the proposed rate.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M04265 — P-871 - Nova Scotia Power Inc. - Application for a Load Retention Rate (2000)

Filing event: APPLICATION on 01/13/2000

9 pages
100%
⬇