U-5-b
Exhibits
01/18/2000
Undertaking 5b - Provide marginal cost for energy production for each plant.
U-5-b.pdf · PDF · 109.4 KB · 1 page
No AI summary available — too little text in this document to summarize.
Filed in: M04265 — P-871 - Nova Scotia Power Inc. - Application for a Load Retention Rate (2000)
Filing event: APPLICATION on 01/18/2000