Pre-Hearing Brief - NSPI
77879.pdf · PDF · 2.7 MB · 12 pages
AI overviewWhat this document contains
This document is a pre-hearing brief submitted by Nova Scotia Power Incorporated in a regulatory matter before the Nova Scotia Energy Board. It covers the company's application for approval of a Load Retention Rate, including its legal basis, compliance with the Public Utilities Act, and arguments regarding the justification and non-discrimination of the proposed rate.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M04265 — P-871 - Nova Scotia Power Inc. - Application for a Load Retention Rate (2000)
Filing event: APPLICATION on 01/10/2000