58003 Other documents 10/30/2006

Participant responses to Preliminary Issues List for P-886

Download original
58003.pdf · PDF · 13.5 MB · 35 pages
AI overviewWhat this document contains

This document is an exhibit containing multiple submissions and correspondence related to the Preliminary Issues List for P-886, a regulatory matter involving Nova Scotia Power Inc.'s 2007 Rate Hearing. It covers stakeholder responses, including comments from Barrington Wind Energy Limited, the Canadian Manufacturers & Exporters, the Halifax Regional Municipality, and Nova Scotia Power Inc., addressing topics such as rate design, fuel costs, renewable energy deployment, demand-side management, integrated resource planning, and the need for a hearing on cost of service methodology.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M06319 — P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007

Filing event: APPLICATION on 10/30/2006

35 pages
100%
⬇