N-7 Exhibits 02/01/2016

NSPI (Municipal Electric Utilities Nova Scotia Cooperative) Responses to IR-1 to IR-3

Download original
N-7.pdf · PDF · 12.9 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit containing NSPI's responses to information requests (IR-1 to IR-3) from Municipal Electric Utilities of Nova Scotia regarding demand-side management (DSM) cost allocation and recovery under NSUARB matter M07151. It addresses regulatory processes for DSM cost allocation methodologies, stakeholder collaboration, and whether DSM costs should be included in the Fixed Allowance Method (FAM), referencing section 79M(5) of the Public Utilities Act.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M07151 — E-R-15 - Nova Scotia Power Inc. (NSPI) - 2016-2018  DSM Plan - NSPI Cost Allocation Proposal10/30/2015

3 pages
100%