64871 Other documents 02/17/2016

Submission - Consumer Advocate

Download original
64871.pdf · PDF · 96.0 KB · 4 pages
AI overviewWhat this document contains

Intervenor submission by the Consumer Advocate addressing Nova Scotia Power Inc.'s DSM (Demand Side Management) cost allocation and recovery, including 2017-18 cost recovery, true-up of 2015-2016 expenditures, and allocation of enabling strategies costs under matter M07151. The submission disputes NSPI's claims about rate absorption, challenges proposed cost recovery mechanisms, and opposes NSPI's allocation methodology for enabling strategies.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M07151 — E-R-15 - Nova Scotia Power Inc. (NSPI) - 2016-2018  DSM Plan - NSPI Cost Allocation Proposal10/30/2015

4 pages
100%