Generation Utilization and Optimization Final Report Appendices 5.4 and 5.5 - Synapse
N-1-(ii).pdf · PDF · 1.3 MB · 20 pages
AI overviewWhat this document contains
Exhibit from a Nova Scotia Energy Board regulatory matter containing capacity factor tables for thermal generation units under multiple scenarios, covering periods from 2018 to 2042. Topics include thermal fleet utilization, optimization, and analysis of capacity factors influenced by demand-side management, wind capacity credits, and retirement paths.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M08059 — Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization