75503 Other documents 10/04/2018

Notice of Intervention - NSPI

Download original
75503.pdf · PDF · 28.7 KB · 2 pages
AI overviewWhat this document contains

This document is an intervention filing by Nova Scotia Power Inc. (NS Power) in a regulatory matter before the Nova Scotia Utility and Review Board. It covers NS Power's intent to formally intervene in a proceeding related to EfficiencyOne's request to use measure-level Non-Energy Benefits in Cost-Effectiveness testing for future Demand Side Management planning.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08888 — E-ENS-G-18 - EfficiencyOne - Evaluation of DSM Programs - Application to allow inclusion of Non-Energy BenefitsEfficiencyOne - Application for approval of the use of Non-Energy Benefits within Cost-Effectiveness Testing

2 pages
100%