E-1-1 Exhibits 02/28/2019

Application

Download original
E-1-1.pdf · PDF · 9.8 MB · 429 pages
AI overviewWhat this document contains

This document is an exhibit filed in a regulatory matter before the Nova Scotia Utility and Review Board. It contains EfficiencyOne's application for approval of a 2020-2022 Demand Side Management (DSM) Resource Plan and a Supply Agreement with Nova Scotia Power Inc., including details on energy savings targets, reporting requirements, program design, and alignment with the 2014 Integrated Resource Plan.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M09096 — Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan

429 pages
100%