E-15 Exhibits 04/29/2022

NSPI (IG) RIR-1 to RIR-3

Download original
E-15.pdf · PDF · 1.6 MB · 26 pages
AI overviewWhat this document contains

This document is an exhibit (E-15) filed in a Nova Scotia Energy Board regulatory matter, containing technical details and calculations related to avoided transmission and distribution (T&D) costs for NS Power's 2023-2025 Demand Side Management (DSM) Resource Plan. Topics covered include methodologies for calculating avoided T&D costs based on peak demand reductions, cost allocation by rate class, system growth projections, infrastructure capacity thresholds, and supporting data tables and formulas.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M10473 — E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application

26 pages
100%