86171 Other documents 04/14/2022

CA (E1) IR-1 to IR-7

Download original
86171.pdf · PDF · 148.8 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing information requests (IRs) and responses related to EfficiencyOne's (E1) application for approval of a supply agreement with Nova Scotia Power Inc. (NS Power) and its 2023-2025 Demand Side Management (DSM) Resource Plan. Topics covered include E1's compliance with low-income spending and savings targets, attribution of DSM savings, coordination between E1's and NS Power's programs, efficiency criteria for residential measures, technical assumptions for energy efficiency measures, and a comparison of the Settlement Plan to the Round 3 Preferred Plan.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M10473 — E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application

2 pages
100%