IG (NSPI) IR-1 to IR-2
90071.pdf · PDF · 158.6 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains two information requests submitted by the Industrial Group to Nova Scotia Power Incorporated (NSPI) regarding the 2023 Load Forecast Report, including questions about cost allocation and the inclusion of new facilities in Cape Breton related to green hydrogen production.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M11108 — P-194 - Nova Scotia Power Inc. (NSPI) - 2023 Load Forecast Report