N-3 Exhibits 09/08/2023

Comments - Synapse

Download original
N-3.pdf · PDF · 300.6 KB · 11 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains technical analysis and supporting data related to Nova Scotia Power Inc.'s updated 2023 Evergreen Integrated Resource Plan (IRP), including modeling scenarios, NPVRR metrics, capacity additions, and discussions on renewable energy targets, hydrogen, battery storage, and infrastructure needs such as the Reliability Tie and Atlantic Loop.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11307 — P-884 - Nova Scotia Power Inc. - 2023 Evergreen  Integrated Resource Plan (IRP) -  Action Plan and Roadmap

Filing event: APPLICATION on 09/08/2023 · View digest →

11 pages
100%