N-2 Exhibits 09/19/2024

NSPI (CA) RIR-1 to RIR-6 - Redacted

Download original
N-2.pdf · PDF · 1.0 MB · 12 pages
AI overviewWhat this document contains

This document is an exhibit (Exhibit N-2) from a regulatory information response (RIR) batch filed with the Nova Scotia Energy Board. It contains redacted portions of NSPI's 2024 10-Year System Outlook Report (NSUARB M11764), including responses to information requests regarding infrastructure planning, geothermal technologies, the Reliability Tie project, unplanned outages, and the Planning Reserve Margin (PRM). Topics covered include NSPI's monitoring of emerging technologies, resource planning through 2030, cost breakdowns for unit recalls, and details on the 345 kV L-8001 transmission line outages.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11764 — Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024

Filing event: RIR on 09/19/2024 · View digest →

12 pages
100%