95186 Other documents 08/28/2024

SWEB (NSPI) IR-1 to IR-5

Download original
95186.pdf · PDF · 223.0 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains questions and concerns raised by SWEB Development regarding NSP's high dropout rates in the Rate Base Procurement, delays in RBP projects due to transmission system connection issues, and plans to prevent similar problems in the Green Choice procurement, including topics such as interconnection capacity, planning, in-service dates, hydrogen production, and grid reliability constraints.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11764 — Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024

Filing event: APPLICATION on 08/28/2024 · View digest →

2 pages
100%