N-7 Exhibits 03/28/2025

Compliance Filing - Redacted

Download original
N-7.pdf · PDF · 1.0 MB · 8 pages
AI overviewWhat this document contains

This document is an exhibit from a compliance filing submitted by Nova Scotia Power Inc. (NS Power) in a regulatory matter before the Nova Scotia Utility and Review Board (NSUARB). It contains redacted financial data related to the 2025 Weighted Average Cost of Capital (WACC) and Allowance for Funds Used During Construction (AFUDC) rates, including details on capital structure, interest calculations for short-term and long-term debt, and budget forecasts.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11990 — Nova Scotia Power Inc. - WACC and AFUDC Rates Application for 2025

8 pages
100%