UTILITY (NSEB) RIR-1 to RIR-7 (redacted)
T-6.pdf · PDF · 43.2 MB · 25 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of a RIR batch in a Nova Scotia Energy Board regulatory matter. It contains information related to a site visit conducted by the Riverport Electric Light Commission and Strum Engineering to the Tanner residence, findings and recommendations regarding electrical clearance issues, remedial work undertaken, and references to applicable Canadian Standards Association (CSA) and electrical code requirements for conductor clearances.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12104 — Riverport Electric Light Commission Complaint - Power Poles - Martin and Wendy Tanner
Filing event: RIR on 06/13/2025