98750 Other documents 07/29/2025

SBA (NSPI) IR 1 to 6

Download original
98750.pdf · PDF · 191.0 KB · 3 pages
AI overviewWhat this document contains

This document is an information request (IR) filed as part of a regulatory matter with the Nova Scotia Energy Board, containing questions and requests for information related to a Joint Use Agreement between NSPI and Bell Aliant, including topics such as line extension processes, cost recovery, asset re-engineering, pole transfers, accounting policies, and service level agreements.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12149 — Nova Scotia Power Inc. - Investigation arising from Joint Use Agreement between NS Power and Bell Aliant

Filing event: APPLICATION on 07/29/2025

3 pages
100%