98203 Other documents 06/24/2025

NSEB (NSPI) IR 1 to 9

Download original
98203.pdf · PDF · 223.7 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board (NSEB) regulatory matter, containing a series of information requests (IR-1 to IR-9) directed to Nova Scotia Power Inc. (NS Power) regarding various aspects of their 2025 Evergreen Integrated Resource Plan (IRP) Action Plan and Roadmap Update, including emissions sharing, capital expenditures, reliability tie capacity, regulatory exemptions, system load assessments, sustaining capital values, hydrogen retrofitting, hybrid peak mitigation scenarios, and progress on the Effective Load Carrying Capability (ELCC) study.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12247 — Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update

4 pages
100%