NSPI (SNS) RIR 1 to 4
N-6.pdf · PDF · 164.6 KB · 5 pages
AI overviewWhat this document contains
This document is an exhibit (N-6) from a regulatory matter filed with the Nova Scotia Energy Board. It contains peak demand figures for 2024, 2030, and 2035, both inclusive and exclusive of behind-the-meter solar generation, based on the 2025 Load Forecast Report, as well as details on the RES contribution, assumptions about behind-the-meter solar adoption, and references to evaluations of NS Power's Time Variable Pricing (TVP) Pilot Program.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12349 — Nova Scotia Power Inc. (NSPI) - 2025 Load Forecast Report