99234 Other documents 09/05/2025

Board Letter re: Accepted as filed

Download original
99234.pdf · PDF · 244.7 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains the Board's acceptance of Nova Scotia Power Inc.'s re-filed 2024 Short Run Marginal Cost (SRMC) Test to Rates Report, which discusses the impact of changes in generation mix on marginal costs, the use of price elasticity estimates in load forecasting, and the Board's direction for a sensitivity analysis if price elasticity changes in the TVP program.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12350 — Nova Scotia Power Inc. - 2024 Short Run Marginal Cost (SRMC) Test to Rates Report

Filing event: APPLICATION on 09/05/2025

2 pages
100%