N-1 Exhibits 07/07/2025

Application

Download original
N-1.pdf · PDF · 1.5 MB · 9 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in the POA Cell Capping 2025 proceeding. It contains information related to a capital project authorization for the capping of Ash Disposal Cell 2 at the Point Aconi Generating Station, including budget estimates, project scope, environmental compliance, cost breakdowns, and various checklists and maturity matrices for project planning and regulatory requirements.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12371 — Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405

Filing event: APPLICATION on 07/07/2025

9 pages
100%