NSEB (NSPI) IR 1 to 5
98779.pdf · PDF · 185.8 KB · 4 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a series of information requests (IRs) from the Energy Board to Nova Scotia Power Inc. regarding details of a $1,218,254 boiler refurbishment project, including clarification on project separation, capital item usage, refractory projects, past and future project scopes, refurbishment details, service life extensions, and maintenance strategies in relation to the Point Aconi Generating Station's planned retirement.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12372 — Nova Scotia Power Inc. - CI C0067906 – POA Boiler Refurbishment 2025 – $1,218,254
Filing event: APPLICATION on 07/31/2025 · View digest →