Application
N-1.pdf · PDF · 1.2 MB · 5 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains information regarding the Ragged Lake Generator Replacement project, including expenditure profiles, project timelines, budget variances, and technical details about the replacement of aging infrastructure at the NS Power Control Centre.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12374 — Nova Scotia Power Inc. - CI C0017098 – Ragged Lake Generator Replacement - $1,681,714 (FIN)
Filing event: APPLICATION on 07/07/2025 · View digest →