N-12 Exhibits 11/18/2025

Cleary (IG) RIR 1 to 8

Download original
N-12.pdf · PDF · 287.2 KB · 14 pages
AI overviewWhat this document contains

This document is an exhibit (Exhibit N-12) from a regulatory intervention response (RIR) filed in a Nova Scotia Energy Board (NSEB) matter. It contains technical analyses and arguments regarding the allowed return on equity (ROE) for Nova Scotia Power's Maritime Link project (NSMPL), comparisons to U.S. and Canadian utilities, proxy group selections for cost-of-capital analysis, and discussions on regulatory risk, equity requirements, and economic forecasting methodologies.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12394 — NSP Maritime Link Inc. -  2026 Assessment Application - NSPML

14 pages
100%