N-32-(xiii) Exhibits 12/02/2025

Attachment M - Table 10 and 11 - Data and Calculations - DCF Growth and Single Stage Estimates - Excel

Download original
N-32-(xiii).xlsx · XLSX · 23.7 KB

The AI overview for this document is being prepared.

Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)

Preview isn’t available for this file type — use Download original above to view it.