103765 Other documents 10/01/2026

Future of Hydro Interested Party Engagement Process – Board Update 1

Download original
103765.pdf · PDF · 171.3 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains information regarding NS Power's General Rate Application, the Board's direction for a structured engagement process on decommissioning hydroelectric assets, and initial steps taken in stakeholder engagement, including discussions on decommissioning levels, economic and socio-economic considerations, and planned consultations with Indigenous groups and other stakeholders.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)

Filing event: APPLICATION on 10/01/2026 · View digest →

3 pages
100%
⬇