99659
Other documents
10/15/2025
Notice of Intervention - SWEB
99659.pdf · PDF · 271.2 KB · 1 page
AI overviewWhat this document contains
This document is an intervenor filing requesting intervenor status in the M12451 – 2026 General Rate Application proceeding. It covers topics such as Fuel and Purchased Power Costs, Rate Base, Load Forecasting, Rate Design, and Climate Change Studies as they relate to the intervenor's business operations.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)