99702 Other documents 10/17/2025

Board Letter re: Final Issues List

Download original
99702.pdf · PDF · 349.6 KB · 10 pages
AI overviewWhat this document contains

This document is a Board Letter re: Final Issues List from a Nova Scotia Energy Board regulatory matter. It covers the Board's response to comments on the Draft Issues List for NS Power's 2026 General Rate Application, including the Board's position on unresolved issues, settlement agreements, the scope of the Final Issues List, and the inclusion of topics such as rate design, fuel costs, reliability, and the impact of the cyber attack on cost accuracy.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)

Filing event: APPLICATION on 10/17/2025 · View digest →

10 pages
100%