N-3 Exhibits 11/26/2025

NSPI (NSEB) RIR 1 to 11 - Redacted

Download original
N-3.pdf · PDF · 1.0 MB · 17 pages
AI overviewWhat this document contains

This document is an RIR batch filing containing NSPI's responses to information requests regarding the 2026 DSM Cost Recovery Rider. It covers topics including DSM cost allocation methods, the application of the DCRR to Renewable to Retail customers, interest rate calculations for BA balances, load forecasts, credit ratings, and various procedural and technical aspects of the rider.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12521 — Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR)

Filing event: RIR on 11/26/2025

17 pages
100%