103217 Other documents 08/14/2026

IESO-NS Letter re: update on timeline and Interim Interconnection Agreement

Download original
103217.pdf · PDF · 138.9 KB · 2 pages
AI overviewWhat this document contains

This exhibit contains an update from IESO Nova Scotia regarding the timeline for revisions to the Transmission System Interconnection Procedures (TSIP) and the status of an interim agreement on interconnection issues with NS Power. Topics covered include the renaming of the SGIP to TSIP, revisions to procedures in response to FERC Order 2023, division of responsibilities between IESO Nova Scotia and NS Power, and the timeline for submitting the revised TSIP to the NSEB.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12524 — Nova Scotia Power Inc. - Concentric FERC Order 2023 Report

Filing event: APPLICATION on 08/14/2026 · View digest →