G-4 Exhibits 11/10/2025

NSPI Response to Board - Redacted

Download original
G-4.pdf · PDF · 1.0 MB · 5 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains NS Power's response to an appeal regarding a $143 priority connection fee charged to Mr. Tariku Gashahun, including details about the fee, NS Power's explanation of its justification, and the subsequent waiver of the fee.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12530 — NSPI DRO Appeal - Billing Issues - Gashahun

Filing event: APPLICATION on 11/10/2025

5 pages
100%