L-2 Exhibits 11/13/2025

NSPI Response - Redacted

Download original
L-2.pdf · PDF · 1.2 MB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains NS Power's response to a complaint regarding the rejection of overhead wiring for a residence, explaining that overhead service cannot be approved due to regulatory requirements mandating either entirely overhead or entirely underground service for row housing, and offering assistance with an underground service upgrade instead.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12536 — NSPI General Complaint - Overhead Wires - Tye Laframboise

Filing event: APPLICATION on 11/13/2025

4 pages
100%