N-5 Exhibits 12/19/2025

NSPI (NSEB) RIR 1 to 14 - Redacted

Download original
N-5.pdf · PDF · 1.4 MB · 22 pages
AI overviewWhat this document contains

This document is an exhibit from a regulatory proceeding before the Nova Scotia Energy Board (NSEB) and contains responses from Nova Scotia Power Inc. (NSPI) to information requests (IR) regarding various aspects of the 2026 annually adjusted rates, including marginal generation costs, biomass fuel prices, reserve margin calculations, energy storage systems, wind resource delays, transmission costs, and tariff adjustments. Topics covered include marginal cost forecasts, energy generation and storage additions, sensitivity analyses, fuel cost changes, and explanations of rate adjustments and tariff transitions.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12551 — Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)

22 pages
100%