100292 Other documents 12/12/2025

Letter PHP re: Request for Interim Approval

Download original
100292.pdf · PDF · 451.0 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains a letter from PHP requesting interim approval of the 2026 ELIADC Energy Charge, including its components, and references relevant provisions of the Public Utilities Act that support the request.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12551 — Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)

3 pages
100%