P-6 Exhibits 04/20/2026

NSPI (NSEB) RIR-5 to RIR-6 (redacted)

Download original
P-6.pdf · PDF · 686.1 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing responses to information requests (RIR-5 and RIR-6) by NS Power regarding the methodology used to estimate electricity usage for Mr. Patel's account, including the use of historical data and seasonal factors. It covers the process for assigning seasonal flags to billing transactions, the selection of specific bills for estimation purposes, and references to related appeals and previous filings.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12616 — NSPI DRO Appeal - Billing Issues - Swati Patel

4 pages
100%