103410 Other documents 09/02/2026

Decision

Download original
103410.pdf · PDF · 781.7 KB · 101 pages
AI overviewWhat this document contains

This document is a ruling from the Nova Scotia Energy Board (NSEB) in a regulatory matter, covering the approval of Nova Scotia Power Incorporated's 2026 Annual Capital Expenditure (ACE) Plan, with specific exceptions and directions provided. Topics include the approval of the ACE Plan, concerns raised about specific projects such as the 2026 RTU Deployment and the TUC Shoreline Sheet Pile Refurbishment, discussions on routine capital expenditures, cost estimation methodologies, and recommendations for improved transparency and reporting in the Routine Program. The document also addresses the Five-Year Reliability Plan, infrastructure improvements, and proposed changes to the CEJC regarding scope changes and project definitions.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12619 — Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million

Filing event: ORDER on 09/02/2026 · View digest →

101 pages
100%