N-43 Exhibits 09/14/2026

Opening Statement - IG

Download original
N-43.pdf · PDF · 41.7 KB · 2 pages
AI overviewWhat this document contains

This exhibit contains the Opening Statement from the Industrial Group in a Nova Scotia Energy Board regulatory matter, discussing differing proposals for determining the Cost-Based Load (CBL) for PHP, including the Dispatchable Rider, interruptible credit, and alignment with the ELIADC approach, as well as concerns raised regarding interactions between ELID and PHP's arrangements.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)

Filing event: APPLICATION on 09/14/2026 · View digest →

2 pages
100%
⬇